Royal Mail: Mount Pleasant

London, United Kingdom
Industry
Construction
Sector
Urban Living
Building Type
Residential

The Project

The project involved the development of a new residential block above the service yard of the Royal Mail sorting office.

Key value we brought to the project

Farrat were appointed by Morrisroe to carry our the design, supply and installation of a pre-cast floating floor slab with an insitu concrete topping. This system was supported on a secondary steel structure which in turn was supported on 100mmm thick Farrat Hybrid Bearings grouted to the primary structure.

Farrat Installation Services carried out the installation which included:

  • Forming, pouring and chamfering of grout beds
  • Placing 244no. 100mm thick Hybrid Bearings
James Fitzgerald
Project Manager, AJ Morrisroe & Sons Ltd.
Farrat Installation Services successfully carried out the installation 2 weeks ahead of the programme and performed with safe and tidy work procedures. The team of the ground were also very helpful and great to work with.

Related Projects

BIMM Riverside: Manchester
Film, TV & Recording Studios BIMM Riverside: Manchester
Farrat supplied our CineFLOOR products to the new film school BIMM in Manchester.
West London Film Studios
Film, TV & Recording Studios West London Film Studios
West London Film Studios needed an acoustic isolation solution for its expansion, adding 90,000 of production...
REEL Cinemas: Marassi Galleria Mall
Cinema REEL Cinemas: Marassi Galleria Mall
We worked with our regional partner UniGroup to deliver an acoustic isolation solution for the REEL Cinema...

Challenge our engineers

Contact us now for an initial consultation.

Contact Us