The project involved the development of a new residential block above the service yard of the Royal Mail sorting office.
Royal Mail: Mount Pleasant
London, United Kingdom
Industry
Construction
Sector
Urban Living
Building Type
Residential

The Project
Key value we brought to the project
Farrat were appointed by Morrisroe to carry our the design, supply and installation of a pre-cast floating floor slab with an insitu concrete topping. This system was supported on a secondary steel structure which in turn was supported on 100mmm thick Farrat Hybrid Bearings grouted to the primary structure.
Farrat Installation Services carried out the installation which included:
- Forming, pouring and chamfering of grout beds
- Placing 244no. 100mm thick Hybrid Bearings
Farrat Installation Services successfully carried out the installation 2 weeks ahead of the programme and performed with safe and tidy work procedures. The team of the ground were also very helpful and great to work with.