The challenge

The rise in energy costs across the UK means that energy efficiency is a growing and more pressing consideration for businesses looking for new premises.

In addition to the cost of gas and electricity bills, energy efficiency is important to businesses looking to ensure they are minimising their carbon footprint wherever possible and to be able to demonstrate that.

The number of outside spaces including balconies and roof terraces, as well as the creative use of façades in the classic design of this building, meant that to maximise energy efficiency without compromising on structural integrity Structural Thermal Breaks would need to be used across the entirety of the façade at multiple structural connection scenarios

Another key challenge in any high-rise building development is fire safety. Since the Grenfell disaster where 72 people died and another 70 people were injured when a 24-story block of flats burnt down, the use of fire-safe materials has been at the front of both residents’ and developers’ minds – especially in high-rise buildings – as has the new legislations being rolled out across England and Wales.

The recently enacted Building Safety Act 2022 has been created to address an identified lack of oversight, as well as to clarify the roles and responsibilities within the construction and maintenance of ‘high-risk development’ (buildings that are at least eighteen metres tall or at least seven floors, containing two or more dwellings.) The level of accountability and scrutiny that this act drives further increases the focus on and demand for fire-resistant materials wherever possible.

The solution

Farrat TBF was the fire-rated structural thermal break material selected by façade specialists Josef Gartner GmbH to prevent heat transfer through beams where the external building aspects meet the interior.

Farrat TBF is an A2,s1,d0 rated non-combustible structural thermal break material that can maintain optimal structural performance at temperatures at 550°C and maintain integrity beyond 1000°C In addition to being the leading fire-rated thermal break solutions; exceeding all current fire regulatory requirements for buildings above (and below) 18m, Farrat TBF also provides high-level thermal performance to solve structural thermal bridge issues.

The outcome

states Chris Lister, Commercial Manager of Structural Thermal Breaks at Farrat.

Related Projects

Ensuring Safety and Compliance – PAT Testing for a UK Manufacturer
Industrial / Manufacturing Ensuring Safety and Compliance – PAT Testing for a UK Manufacturer
Farrat was asked to perform Pre-Acceptance Test (PAT) on a new piece of machinery.
Paddington Square London, UK
Commercial Paddington Square London, UK
In this magnificent building designed by Renzo Plano, TBF was used to thermally decouple the façade,...
Valpraxis, Geneva, Switzerland
Commercial Valpraxis, Geneva, Switzerland
TBK was used to thermally insulate the façade from the reinforced concrete frame of the building. A high...

Challenge our engineers

Contact us now for an initial consultation.

Contact Us