AFRC / Strathclyde Uni

United Kingdom
Main Contractor
ROC
Structural Engineer
The Structural Partnership
Architect
Hypostyle Architects
Key Facts
Slab thickness: 123mm
Natural frequency: 10Hz

The Challenge

The machine, used for performing demanding measuring tasks in laboratory and production environments, is extremely heavy with only three support feet each loaded with 17kN point loads which would in turn cause high pressure loadings on the floating slabs. There would also be other equipment of varying loads to go on the slab and the layout was regularly altered leading up to the final layout. All of this contributed to a fairly demanding design and installation process.

The Solution

Working in close partnership with all parties including the Structural Engineer, Architect and Main Contractor, Farrat came up with a solution which would meet the specific challenges posed by this unique R&D laboratory application.

In the end it was decided to split the slab to provide appropriate load bearing on one slab with an imposed loading of 8kN/m2 where the CMM was to be located and imposed loading of 3kN/m2 for other equipment on the second slab.

AcouStruct installed the dry systems, then handed over to the client to install the mesh and pour the concrete slab.

John Mitchell
Team Leader/Technical Manager, ROC Building Ltd
On what was a highly bespoke job we appreciated the high level of technical proficiency demonstrated by Farrat.

Related Projects

The Stephen A. Schwarzman Centre for the Humanities at Oxford
Construction The Stephen A. Schwarzman Centre for the Humanities at Oxford
Building Acoustics, Building Vibration Control
Amada combination machine installed on suspended floor
Industrial Buildings Amada combination machine installed on suspended floor
Isomat used to control vibration from punching machine installed on suspended floor that was disturbing...
Riverside Studios, London
Film, TV & Recording Studios Riverside Studios, London
Farrat designed and provided structural acoustic isolation for the world famous Riverside Studios in...
Ensuring Safety and Compliance – PAT Testing for a UK Manufacturer
Industrial Ensuring Safety and Compliance – PAT Testing for a UK Manufacturer
Farrat was asked to perform Pre-Acceptance Test (PAT) on a new piece of machinery.
Ritz Carlton: Wuhan
Hotels Ritz Carlton: Wuhan
Farrat provided an optimal floating floor solution to luxury hotel the Ritz Carlton in Wuhan, China.

Challenge our engineers

Contact us now for an initial consultation.

Feedback