Ropemaker

United Kingdom
Farrat Solutions
Farrat TBF

Project Overview

The challenge

The rise in energy costs across the UK means that energy efficiency is a growing and more pressing consideration for businesses looking for new premises.

In addition to the cost of gas and electricity bills, energy efficiency is important to businesses looking to ensure they are minimising their carbon footprint wherever possible and to be able to demonstrate that.

The number of outside spaces including balconies and roof terraces, as well as the creative use of façades in the classic design of this building, meant that to maximise energy efficiency without compromising on structural integrity Structural Thermal Breaks would need to be used across the entirety of the façade at multiple structural connection scenarios

Another key challenge in any high-rise building development is fire safety. Since the Grenfell disaster where 72 people died and another 70 people were injured when a 24-story block of flats burnt down, the use of fire-safe materials has been at the front of both residents’ and developers’ minds – especially in high-rise buildings – as has the new legislations being rolled out across England and Wales.

The recently enacted Building Safety Act 2022 has been created to address an identified lack of oversight, as well as to clarify the roles and responsibilities within the construction and maintenance of ‘high-risk development’ (buildings that are at least eighteen metres tall or at least seven floors, containing two or more dwellings.) The level of accountability and scrutiny that this act drives further increases the focus on and demand for fire-resistant materials wherever possible.

The solution

Farrat TBF was the fire-rated structural thermal break material selected by façade specialists Josef Gartner GmbH to prevent heat transfer through beams where the external building aspects meet the interior.

Farrat TBF is an A2,s1,d0 rated non-combustible structural thermal break material that can maintain optimal structural performance at temperatures at 550°C and maintain integrity beyond 1000°C In addition to being the leading fire-rated thermal break solutions; exceeding all current fire regulatory requirements for buildings above (and below) 18m, Farrat TBF also provides high-level thermal performance to solve structural thermal bridge issues.

The outcome

states Chris Lister, Commercial Manager of Structural Thermal Breaks at Farrat.

Related Projects

Cineworld: Atria Watford
Leisure Cineworld: Atria Watford
Farrat delivered optimal acoustic isolation for the Cineworld branch in the Atria shopping centre in...
Cineworld: O2 Dome Greenwich
Leisure Cineworld: O2 Dome Greenwich
London's biggest cinema, the Cineworld in the O2 Dome, needed an acoustic isolation solution to achieve...
The Light Cinema: Addlestone One
Leisure The Light Cinema: Addlestone One
The Light cinema in Addlestone required an acoustic isolation solution that would give audiences a high-quality...
Cineworld: Dalton Park
Leisure Cineworld: Dalton Park
Leading U.K. cinema brand Cineworld needed an acoustic isolation solution for its Dalton Park branch....
Cineworld: The Lexicon
Leisure Cineworld: The Lexicon
Cineworld Bracknell required an acoustic isolation solution for its 12-screen cinema to deliver exceptional...
181 Talgarth Road
Urban Living 181 Talgarth Road
We need to isolate the building from the railway line but are due to cast the ground floor slab in 3...

Challenge our engineers

Contact us now for an initial consultation.

Contact Us