A line of 11 bodymakers is installed on three un-isolated monolithic foundations. The neighbouring building, located about 40 meters away from the machines, was complaining about excessive vibrations being transmitted to their premises.
Addressing excessive vibrations being transmitted to building neighbouring Can Manufacturer
Poland
Project Overview
The Challenge
Farrat were called to carry out a vibration investigation to assess the situation and present potential mitigation solutions.
Measurements were taken on and off the foundations in the factory to determine the degree of isolation provided by the inertia blocks, and outside, between the plant and neighboring building to measure vibration propagation to the surroundings.
The Results
Full transmission from foundation to factory floor
Related Projects
Film, TV & Recording Studios Riverside Studios, London
Farrat designed and provided structural acoustic isolation for the world famous Riverside Studios in...
Industrial / Manufacturing Ensuring Safety and Compliance – PAT Testing for a UK Manufacturer
Farrat was asked to perform Pre-Acceptance Test (PAT) on a new piece of machinery.
Hotels Ritz Carlton: Wuhan
Farrat provided an optimal floating floor solution to luxury hotel the Ritz Carlton in Wuhan, China.
Theatre, Event & Concert Halls The Royal Academy of Music
Farrat was honoured to deliver acoustic isolation for The Royal Academy of Music in Regent's Park, L...
Hotels Hyatt Hotel: Hangzhou Xiaoshan Airport
The airport-based Hyatt Hotel in Hangzhou needed an acoustic isolation solution in order to reduce sound...
Challenge our engineers
Contact us now for an initial consultation.