A line of 11 bodymakers is installed on three un-isolated monolithic foundations. The neighbouring building, located about 40 meters away from the machines, was complaining about excessive vibrations being transmitted to their premises.
Addressing excessive vibrations being transmitted to building neighbouring Can Manufacturer
Poland
Project Overview
The Challenge
Farrat were called to carry out a vibration investigation to assess the situation and present potential mitigation solutions.
Measurements were taken on and off the foundations in the factory to determine the degree of isolation provided by the inertia blocks, and outside, between the plant and neighboring building to measure vibration propagation to the surroundings.
The Results
Full transmission from foundation to factory floor